IEC 61850 From Specification to the Substation – The OSMOSE Project Contribution to Improve the IEC 61850 Engineering Process
IEC 61850 Utilizing IEC 61850 Standard for the circuit based wide area distribution automation system
Digital Substations • IEC 61850 • Testing • Time Related Issues Application of Precision Time Protocol Standard with multi-vendor Relays over PRP and HSR Architectures: A Real Test of the PTP Standard in project FITNESS
Cover Story • Digital Substations • IEC 61850 • Time Related Issues Time in IEC 61850 based substation protection and control systems